She has had only a little work done to her --
2 newer sprockets
some Hoses
primary blade valve mount (located on right fender)
all Fluids
Left Final -bearings,seals,axle and bull gear
Right Final bearings and seals
Welding and re-enforcement on the Blade Lift Frame
some new Pad Bolts
Lots of missing Nuts and Bolts
some Electrical re-wiring and battery relocation on left fender
Radiator mounts and Hydraulic Tank Mounts
custom main clutch adjustment rod since the adjuster was welded to the shaft
Upper Idler
6 way Blade plate shims to tighten it up
Front Cross Bar
2 new Steering Handles (JD Crawler.com)
Track frame built up at front idler (both sides)
Track tension seals
Redone custom deluxe seat
Still need to fix
-clutch/brake shaft seal leaks pretty good about 1 pint an hour when running steady
- a couple of hood bolts need to be re-welded to the broken frame brackets large washers just don't hold tight enough.
-track (would like new rails,pins and bushings)
-Sprocket guard and tensioner covers
-Paint




