JD 450C top track roller

Post support questions about your JD350 and newer crawler here
Post Reply
TXBobcat
MC crawler
MC crawler
Posts: 1
Joined: Fri Jul 27, 2012 8:21 am
Location: China Spring, TX

JD 450C top track roller

Post by TXBobcat » Fri Jul 27, 2012 12:02 pm

I am trying to figure out the correct procedure for installing a new top carrier track roller on on a JD 450C. The old roller broke off the shaft, and at this point, the old shaft is what is left, attached to the bracket.

I have purhcased a new part, which includes the roller and shaft all in one piece. I am assuming the shaft is pressed into the bracket; therefore, I will need to remove the bracket holding the old shaft, then have the old shaft pressed out, on the new one pressed in.

Please let me know if this is the correct procedure.

Thanks in advance,
Bob

User avatar
CatD8RII
1010 crawler
1010 crawler
Posts: 324
Joined: Mon Jan 16, 2006 9:26 am
Location: PA

Post by CatD8RII » Sat Jul 28, 2012 5:09 am

You pretty much hit the nail on the head. Many aftermarket rollers come assembled with the shaft. Check your service manual for the how far to push the shaft in, there is a measurement from the seal surface on the bracket to the end of the shaft.

Post Reply

Who is online

Users browsing this forum: No registered users and 329 guests